The construction of a wind turbine
Documentation

How is a wind turbine created?

3

wind turbines

6

month film project

> 6.000

households are supplied with electricity

Time-lapse recording of the construction of the wind farm in Rüssingen.

In this spectacular time-lapse documentation for Pfalzwerke AG, the construction of a wind turbine in the North Palatinate is shown. A site concept was developed near Rüssingen and Marnheim that integrates as harmoniously as possible into the rolling hills of the North Palatinate and still makes an efficient and important contribution to the energy transition. The three wind turbines, which went into operation in the summer of 2018, supply around 6,000 households with sustainably produced electricity every year. The operator of the systems is Pfalzwerke AG.